Our Projects

Sr Particular Year
1 Meiktila-Kyaukpadaung-Nyaung oo Road 2008
2 Nyaung Oo-Myin Gyan Road 2008 
3 LatPanChePaw-Pakokku-Myaing-Linkadaw-Monywa Road 2013
4 KawHmu-WarpalaukThauk-ThaYetTaw Road 2014
5 North Yamar Bridge Upgrading Project 2015
6 Mandalay – Phottaw – Moegoke Road (8 miles) (Mandalay Region) 2010 
7 New Construction of Kanni Chaung Bridge (No. 2/13)  2016
8 Nga Moe Yeik Bridge (Thit Sar ) Project 2017
9 South Dagon - Thuwanna Bridge (Nga Moe Yeik Bridge, Kamarkyi-2) Project 2017

 

B.O.T projects

The Ministry of Construction let us take care of maintaining and reconstruction of Meikhtilla-Kyaukpadaung-Nyaung Oo road in Built-Operate-Transfer (B.O.T) system in 2008. Then Myat Noe Thu started road construction fields and tried its best in this road construction by competence effort of its intelligent employees and skillful engineers. So we can proudly implement Meikhtilla-Kyaukpadaung-Nyaung Oo highway road development within two years. The public who use frequently this highway get the benefit of smooth travelling and safe driving. Then Myat Noe Thu gained good reputation as a efficient construction company among B.O.T companies till now.

Meikhtilla-Kyaukpadaung Road

Meikhtilla-Kyaukpadaung Road

Meikhtilla-Kyaukpadaung Road

Meikhtilla-Kyaukpadaung Road

North Yamar Bridge Upgrading

The Ministry of Construction let us to upgrade north Yamar bridge. We do the best in this project.

Arial View of Bridge

Plate Girder Positioning

Girder Positioning

Girder Positioning

KawHmu-WarPaLoutThauk-ThaYettaw Road

This Road is implemented by Myat Noe Thu Company. The Road is 13 mile and 2.5 furlong long and located in Delta Region. So we designed and constructed with Geo-Textile technology.

Arial View

Earth Work

Earth Work

After Wearing Course

Arial View

Nga Moe Yeik Bridge (Thitsar)

This bridge was proudly implemented by Myat Noe Thu Construction Company. The bridge connect south Okkalapa township and north Dagon township across Nga Moe Yeik creek. The Bridge is 280 meter in length and  11.5 meter in breath.

Arial View of Bridge

Main Bridge

Main Bridge

Name of Bridge  -  Nga Moe Yeik Bridge (Thit Sar)

Creek Name - Nga Moe Yeik Creek

Bridge Type

  • Substructure - 1.2 m Ø Bored Pile, RCC Reinforced Concrete
  • Superstructure  -  60 m Steel Box Girder, 20 m RC Girder

Bridge Length  -  280 m

Approach Road 

  • South Okkala -  65 m
  • North Dagon  -  63 m

Bridge Width  -  11.5 m (1.75 m + 0.5 m + 3.5 m) x 2 sides

  • Motor Way  -  3.5 m x 2 Lanes
  • Walk Way  -  1.75 m x 2 Lanes
  • Clearance  -  0.5 m x 2 sides

Span Arrangement

  • Approach Bridge (South Okkalapa) - (10m x 3) + (20m x 4)
  • Approach Bridge (North Dagon) - (10m x 3)+(20m x 4)
  • Main Bridge - 60m

Navigation Clearance 

  • Horizontal - 50 m (H.W.L)
  • Vertical - 5.5 m (L.W.L)

          

South Dagon - Thuwanna Bridge

(Nga Moe Yeik Bridge, Kamarkyi-2)

The current project what we are implementing is also a bridge over Nga Moe Yeik creek. The bridge is being implemented at the downstream of the current Nga Moe Yeik (ThitSar) bridge.

Bridge Design

  

Signing Ceremony & First Bored Pile Drilling Work

    

 

60m U Shaped Steel Box Girder Assembly

PSC e-Beams and current situation of Bridge Construction Site.

Completed Photo

 

 

 

 

Topographic Plan view

Name of Bridge  South Dagon - Thuwanna Bridge

Creek Name - Nga Moe Yeik Creek

Bridge Type

  • Substructure - 1.2 m Ø Bored Pile, RCC Reinforced Concrete
  • Superstructure  -  60 m Box Arch Girder, 36 m PSC e-Beam

Bridge Length  -  258 m

Approach Road 

  • Thuwanna    -  75 m 
  • South Dagon  -  44 m

Bridge Width  -  11.5 m (1.75 m + 0.5 m + 3.5 m) x 2 sides

  • Motor Way  -  3.5 m x 2 Lanes
  • Walk Way  -  1.75 m x 2 Lanes
  • Clearance  -  0.5 m x 2 sides

Span Arrangement

  • Approach Bridge (Thuwanna) - (10m x 4)
  • Approach Bridge (Dagon) - (10m x 3)+(20m x 1)
  • Main Bridge - (36m+60m+36m+36m)

Navigation Clearance 

  • Horizontal - 54 m (H.W.L)
  • Vertical - 5.5 m (L.W.L)

Bridge Width

Steel Box Arch Girder

Free Board Status